University of Michigan Home Page

Project Overview

Site Plan

Design

Photos

Project Team

Location of Project

Informative Links

QuickTime Video

Web Cam

Quality Control

Monthly Updates (PDF)
May 2002
April 2002
March 2002
February 2002
January 2002
December 2001
November 2001
October 2001
September 2001
August 2001
July 2001
June 2001
May 2001
April 2001
March 2001
February 2001
January 2001
Nov/Dec 2000
October 2000
September 2000

Bid Com
Major Projects

HOME

Palmer Drive Development

Overview

Palmer Drive Development Scale Model The Palmer Drive Development at the University of Michigan consists of a complex of buildings at the southwest corner of Washtenaw Avenue and Huron Street. Existing buildings that will be incorporated into the area include the Power Center for the Performing Arts, the Central Power Plant, and the Fletcher Street parking structure. The North University Building and Plant Services Building are being demolished. The new buildings included in this development are:

The Life Sciences Institute Building will consist of six floors and a mechanical penthouse to provide "wet" research laboratory and support spaces, core laboratory areas, principal investigators offices, interaction spaces, administrative offices for the Life Sciences Institute, a combination gallery/lobby space, and a small library. The 235,000 gross square feet building will house 325 to 375 people.

The Palmer Drive Parking Structure is expected to accommodate approximately 1,000 parking spaces.

The Commons Building will provide conference space and dining facilities along with retail space. A Department of Public Safety neighborhood office will be located here, as well as Plant Operations department offices. The building will be 99,000 gross square feet.

The Walgreen Drama Center will house the Arthur Miller Theater, which will seat approximately 450, plus a student reperatory theatre with 175 seats.

The Undergraduate Science Instruction Center Building will be located on top of the Palmer Drive Parking Structure. The four-story building will house instructional space for students and space for a variety of science programs.

All of these buildings will be tied together with a new walkway system. This will begin from the sidewalk on the North University Avenue next to the Dental School. Then it passes between the Life Sciences Institute and Undergraduate Science Instruction Building on top of the Palmer Parking Structure. It will continue across a bridge over Palmer Drive and along the east side of the Commons Building. A new pedestrian bridge will continue this path over Washtenaw Avenue, finally sloping down to meet grade near Couzens Hall. This will provide a safe, direct circulation path between Central Campus and the Medical Campus.


University of Michigan - Architecture, Engineering and Construction