Project Overview
|
Perry Building Addition and Renovation |
Overview
The renovation will involve a complete demolition of the interior of the building and construction of new plumbing, heating, cooling, electrical, ventilation, fire protection and electrical systems. The exterior will be refurbished including cleaning and pointing of the brick. New windows will be installed as well as new rain gutters and leaders. The addition, which will be the barrier free entrance, will contain a stair and elevator. The elevator will provide barrier free access to all floors. The building will house the Division of Surveys and Technologies a division within the Institute for Social research. Construction started fall 2000 and is expected to be completed in spring 2002. |
|
|
University of Michigan - Architecture, Engineering and Construction A326 East Hoover Ann Arbor MI 48109-1002 |