| June 2007 |
|
|
|
 |
 |
 |
 |
| 4th Floor Ceiling Grid |
Elevator Platform |
Kitchen Cabinets |
New Copper Flashings |
 |
 |
 |
|
| North Entry Stairs |
North Stair Drywall Ceiling |
Toilet Room Plumbing |
|
| May 2007 |
|
|
|
 |
 |
 |
 |
| West building face |
3rd floor cooridor |
4th floor drywall and piping |
Air handling unit |
 |
 |
 |
|
| Elevator jack casing |
Mechanical room piping |
New front entry stairs |
|
| April 2007 |
|
|
|
 |
 |
 |
 |
| 1st floor interior window |
Basement concrete steps |
Basement copper piping |
Copper downspout and gutter |
 |
 |
|
|
| North site work |
West face windows |
|
|
| March 2007 |
|
|
|
 |
 |
 |
 |
| 1st floor drywall |
2nd floor drywall |
3rd floor corridor |
3rd floor drywall |
 |
 |
 |
 |
| New windows |
Drywall lid |
Electrical room |
Elevator door opening |
| February 2007 |
 |
 |
 |
 |
| Concrete fill in stairs |
Slate on West side |
New chiller unit |
New elevator |
 |
 |
|
|
New Framing at Elevator
|
Classroom piping/drywall |
|
|
| January 2007 |
 |
 |
 |
 |
| Brick infill |
Corridor drywall |
Mechanical equipment pads |
Metal floor joists |
 |
 |
 |
 |
| New Ductwork |
New egress stair |
Sheet metal wall backing |
Window Mock-up |
 |
|
|
|
| Wood framing |
|
|
|
| December 2006 |
 |
 |
 |
 |
| Masonry infill |
Mechanical room slab |
New concrete slab |
New HVAC piping |
 |
 |
 |
 |
| Old floors removed |
Old shaft demolition |
Sand fill and vapor barrier December |
Slab at chiller enclosure |
 |
 |
|
|
| Slate roof replacement |
Stair landing joists |
|
|
| November 2006 |
 |
 and old (red) steel.jpg) |
 |
 |
| Infill at former stairwell |
New (gray) and old (red) steel |
New elevator pit |
New stairwell location |
 |
 |
 |
 |
| New steel column base |
New steel deck |
New steel framing |
Underground Piping |
 |
 |
|
|
| Wall demolition |
Wall framing |
|
|
| October 2006 |
 |
 |
 |
 |
| Condensate & drain piping |
Construction Signs |
Existing clay piping |
Interior conditions |
 |
 |
 |
 |
| Interior progress |
Interior wall demolition |
West site silt fence |
Site driveway view |
 |
|
|
|
| Underground conduit |
|
|
|
| September 2006 |
 |
 |
 |
 |
| Basement view |
Concrete removal |
Interior view |
Joist replacement |
 |
 |
 |
 |
| New plywood floor |
Partial joist replacement |
Site fencing |
West site view |
| August 2006 |
 |
 |
 |
 |
| Bathroom Demolition |
Chiller enclosure area |
Chiller enclosure work |
Chiller enclosure work |
 |
 |
 |
 |
| Existing wall |
Interior Demolition |
Interior Demolition |
New fill for ramp |
 |
 |
|
|
| Service ramp |
SPH Sitework |
|
|
| |
|
|
|