University of Michigan Home Page

Project Overview

Project Data

Design

Photos/3D

Location of Project

State of Michigan Department of Management and Budget

Informative Links

Regents Items- Mason

Regents Items - Haven

Major Projects

HOME

Mason Hall and Haven Hall Addition and Renovation

Photos

Click on the photo for a larger image.
View of the second floor east west corridor of Mason Hall in the finished condition. July 2003
View of the second floor north south corridor of Mason Hall in the finished condition. July 2003
Class room 2427 ready for occupancy. July 2003
Mason second floor finishes taking place in the East/West corridor. June 2003 Mason second floor class rooms with finishes taking place. June 2003 Mason second floor class rooms with finishes taking place. June 2003
   
Mason second floor finishes taking place in the North/South corridor. June 2003    
 
Mason second floor restroom mechanical rough-in. March 2003
Mason Second floor classroom with the ceiling grid installed and walls painted. Light fixtures are on the floor ready for installation. March 2003
 
Shows a boom truck prepairing to make a lift to the penthouse roof of Haven Hall to set ventilation louvers. Febuary 2003.

Shows new construction of a second floor wall in Mason Hall as demolition and construction continue in that area. February 2003 View looking North in Haven Hall on the ground floor with everything cleaned and polished in preparation for an openhouse. February 2003
Perlman Honors Commons looking North in Mason Hall ground floor. January 2003. Mason Hall second floor re-model, new west masonry wall in the men's toilet room seen from the class room side. January 2003
Perlman Honors Commons looking South in Mason Hall ground floor. January 2003.
Study room as part of Perlman Honors Commons Mason Hall ground floor. January 2003. The Honors Area Lounge at the coffee bar. December 2002. The glass front conference room #2 (G423C). December 2002.
East entrance to Haven Hall from the outside. November 2002.
Ground floor of Haven Hall at the posting wall and the grand stairs to the first floor. November 2002
East entrance to Haven Hall from the inside. November 2002
Haven Ground Floor Ceiling. October 2002 Haven Ground Floor Posting Wall. October 2002 Haven Penthouse Elevator Maching Room. October 2002
Mason Hall ground floor Cast Marble Floor Tile installed in the east/west corridor. August 2002
Haven Hall first floor, nearing completion. August 2002 Haven Hall ground floor, grouted slate floor nearing completion. August 2002
East elevation of Haven Hall at the south end, showing new landscape material. July 2002 East side of Haven Hall showing new sidewalk, landscape material and pole lighting. July 2002 South Elevation of Haven Hall showing new landscape material, sidewalk and concrete pad for bench seating. July 2002
Haven Hall ground floor, this is a rift sawn White Oak curved wall for the installation of glass and wood panels.
July 2002
Mason Hall ground floor showing the installation of ceiling grid, painted walls and Cast Marble Tile on the floor of the North - South corridor. July 2002
Mason Hall ground floor showing the East - West corridor in the finishing stages of construction. July 2002
 
Haven Hall fourth floor finished corridors. May 2002
Haven Hall east elevation as it nears completion. May 2002  
Haven east exterior elevation showing ground level lime stone, brick above and window installation. There will be aluminum painted panels installed in the white areas between the windows. February 2002
Haven east exterior elevation at the north entrance showing limestone, brick and glass curtain wall. February 2002 Haven south exterior elevation showing the installed lime stone and canopy curtain wall (glass wall). February 2002
The start of the installation of ceramic tile in Haven ground floor toilet room. February 2002 Haven Hall fifth floor north end, new stairway. January 2002 View of campus to the North from the Haven Elevator Penthouse. Left to right, clock tower, Krause Building, 1908 Chemistry Building and in the background you can see the two tower cranes operating at the Palmer Drive Development. January 2002
East elevation of Haven Hall. January 2002 Haven Hall sixth floor proposed new Deans area. January 2002 Haven Hall first floor corridor rough wall framing. January 2002
12/10/2001 Haven Hall interior framing and plumbing installation (second floor). 12/10/2001 Haven Hall fireproofing of structural steel and decking in the penthouse, air handling equipment protected from overspray from fireproofing. 12/10/2001 Haven Hall East Elevation at the north end, completing installation of masonry and continuing installation of windows.
 
12/10/2001 Mason Hall basement mechanical room, new chiller and circulating pumps for the chilled water system.   3/5/01 Structural steel for new Mason-Haven penthouse.
3/5/01 East elevation of Mason Hall and new structural steel for Haven Hall. 3/5/01 7th floor North East corner of Haven Hall. 3/5/01 Mason Hall 5th floor decking ready for concrete decking installation in Phase B.
2/5/01 Interior of Haven after demolition. 2/5/01 Footings, foundations, and piers that will carry structural steel for east face addition. 2/5/01 Structural steel erection in Fishbowl
     
     
     

University of Michigan - Architecture, Engineering and Construction
A326 East Hoover   Ann Arbor MI 48109-1002  

© 2009 The Regents of the University of Michigan