View of the second floor east west corridor of Mason
Hall in the finished condition. July 2003
|
View of the second floor north south corridor of Mason
Hall in the finished condition. July 2003
|
Class room 2427 ready for occupancy. July 2003
|
 |
 |
 |
| Mason second floor finishes taking place in the East/West
corridor. June 2003 |
Mason second floor class rooms with finishes taking
place. June 2003 |
Mason second floor class rooms with finishes taking
place. June 2003 |
 |
|
|
| Mason second floor finishes taking place in the North/South
corridor. June 2003 |
|
|
 |
 |
|
Mason second floor restroom mechanical rough-in. March
2003
|
Mason Second floor classroom with the ceiling grid
installed and walls painted. Light fixtures are on the floor ready
for installation. March 2003
|
|
 |
 |
 |
| Shows a boom truck prepairing to make a lift to the
penthouse roof of Haven Hall to set ventilation louvers. Febuary 2003.
|
Shows new construction of a second floor wall in Mason
Hall as demolition and construction continue in that area. February
2003 |
View looking North in Haven Hall on the ground floor
with everything cleaned and polished in preparation for an openhouse.
February 2003 |
 |
 |
 |
| Perlman Honors Commons looking North in Mason Hall
ground floor. January 2003. |
Mason Hall second floor re-model, new west masonry
wall in the men's toilet room seen from the class room side. January
2003
|
Perlman Honors Commons looking South in Mason Hall
ground floor. January 2003. |
 |
 |
 |
| Study room as part of Perlman Honors Commons Mason
Hall ground floor. January 2003. |
The Honors Area Lounge at the coffee bar. December
2002. |
The glass front conference room #2 (G423C). December
2002. |
 |
 |
 |
East entrance to Haven Hall from the outside. November
2002.
|
Ground floor of Haven Hall at the posting wall and
the grand stairs to the first floor. November 2002
|
East entrance to Haven Hall from the inside. November
2002
|
 |
 |
 |
| Haven Ground Floor Ceiling. October 2002 |
Haven Ground Floor Posting Wall. October
2002 |
Haven Penthouse Elevator Maching Room.
October 2002 |
 |
 |
 |
Mason Hall ground floor Cast Marble Floor
Tile installed in the east/west corridor. August 2002 |
Haven Hall first floor, nearing completion.
August 2002 |
Haven Hall ground floor, grouted slate
floor nearing completion. August 2002 |
 |
 |
 |
| East elevation of Haven Hall at the south
end, showing new landscape material. July 2002 |
East side of Haven Hall showing new sidewalk,
landscape material and pole lighting. July 2002 |
South Elevation of Haven Hall showing
new landscape material, sidewalk and concrete pad for bench seating.
July 2002 |
 |
 |
 |
Haven Hall ground floor, this is a rift
sawn White Oak curved wall for the installation of glass and wood
panels.
July 2002 |
Mason Hall ground floor showing the installation
of ceiling grid, painted walls and Cast Marble Tile on the floor of
the North - South corridor. July 2002 |
Mason Hall ground floor showing the East
- West corridor in the finishing stages of construction. July 2002 |
 |
 |
|
Haven Hall fourth floor finished corridors.
May 2002 |
Haven Hall east elevation as it nears completion.
May 2002 |
|
 |
 |
 |
Haven east exterior elevation showing ground
level lime stone, brick above and window installation. There will
be aluminum painted panels installed in the white areas between the
windows. February 2002 |
Haven east exterior elevation at the north
entrance showing limestone, brick and glass curtain wall. February
2002 |
Haven south exterior elevation showing
the installed lime stone and canopy curtain wall (glass wall). February
2002 |
 |
 |
 |
| The start of the installation of ceramic
tile in Haven ground floor toilet room. February 2002 |
Haven Hall fifth floor north end, new
stairway. January 2002 |
View of campus to the North from the Haven
Elevator Penthouse. Left to right, clock tower, Krause Building, 1908
Chemistry Building and in the background you can see the two tower
cranes operating at the Palmer Drive Development. January 2002 |
 |
 |
 |
| East elevation of Haven Hall. January 2002 |
Haven Hall sixth floor proposed new Deans
area. January 2002 |
Haven Hall first floor corridor rough wall
framing. January 2002 |
 |
 |
 |
| 12/10/2001 Haven Hall interior framing
and plumbing installation (second floor). |
12/10/2001 Haven Hall fireproofing of structural
steel and decking in the penthouse, air handling equipment protected
from overspray from fireproofing. |
12/10/2001 Haven Hall East Elevation at
the north end, completing installation of masonry and continuing installation
of windows. |
 |
|
 |
| 12/10/2001 Mason Hall basement mechanical
room, new chiller and circulating pumps for the chilled water system. |
|
3/5/01 Structural steel for new Mason-Haven
penthouse. |
 |
 |
 |
| 3/5/01 East
elevation of Mason Hall and new structural steel for Haven Hall. |
3/5/01 7th
floor North East corner of Haven Hall. |
3/5/01 Mason Hall 5th floor decking ready
for concrete decking installation in Phase B. |
 |
 |
 |
| 2/5/01 Interior of Haven after demolition.
|
2/5/01 Footings, foundations, and piers
that will carry structural steel for east face addition. |
2/5/01 Structural steel erection in Fishbowl |
| |
|
|
| |
|
|
| |
|
|