| October 2004 Areaway wall preparation. |
October 2004 Areaway Walls. |
October 2004 Fireproofing lath. |
 |
 |
 |
| October 2004 Sheetpile installation. |
October 2004 Sheetpile installation |
September 2004 Areaway subfooting preparation. |
 |
 |
 |
| September 2004 Areaway excavation. |
September 2004 Areaway excavation. |
September 2004 Areaway excavation. |
1 |
 |
 |
| September 2004 2nd floor. |
May 2004 1st floor demolition. |
April 2004 Demolition 2nd Floor. |
 |
 |
 |
| April 2004 3rd floor demolition. |
April 2004 3rd floor demolition. |
April 2004 5th floor demolition. |
 |
 |
|
| April 2004 Basement Demolition. |
March 2004 Demolition 2nd floor. |
|
| |
|
|