Construction Photos - click on the picture for a larger image.
September 2005      
Junge photo August 2005 Junge photo August 2005 Junge photo August 2005 Junge photo August 2005
Women's room Ramp to toilet rooms South Wall Events area looking north
Junge photo August 2005 Junge photo August 2005 Junge photo August 2005
Piping installed at air-handler New cable routing Facade view  
August 2005      
Junge photo August 2005 Junge photo August 2005 Junge photo August 2005 Junge photo August 2005
Team cookout on the Mortenson Family Plaza Plaza pavers complete, looking northeast New paving on Stadium Concourse New dumpster enclosure
Junge photo August 2005 Junge photo August 2005 Junge photo August 2005
Nearly completed facade Masons installing the M Crisler sidewalk replacement  
July 2005

Events space looking southwest

Brick parapet and peastone paver base
New fence posts and waterproofing
Waterproofing nearly completed
Starting brick at parpet wall
Site overview looking east
New cooling unit
Toilet room wall layout
June 2005
Crisler concourse decking
Masonry parapet wall installed
New Crisler concourse slab
Prepped to place Plaza concrete
Plaza deck and wall pre-waterproofing
New stair framing
New steel framing in Crisler
Underslab plumbing at new toilet rooms
May 2005
Deck with stud bolts Decking ready for installation First lift of waterproofing Framing through receiving door
Lobby area looking south Steel and deck complete Steel erection View from the west
April 2005      
Crisler mass excavation complete Wall forms Excavating inside Crisler Footings at new receiving door
   
New concrete wall Wall footings    
March 2005      
New raceways for power feeds
Temporary partition wall
Trophy case demolition
Tunnel demolition
Crisler foundations after tunnel demolition
Debris from tunnel
Excavating to grade
February 2005      
Crisler foundations exposed by excavation


Excavation and demolition
Excavation
New telecom conduits to Crisler (north)
       