| June 2005 |
|
|
|
 |
 |
 |
 |
June 27, 2005 – West Elevation |
June 27, 2005 –Atrium Skylight Soffits |
June 27, 2005 - Southeast Elevation |
June 27, 2005 - Northeast Elevation |
| May 2005 |
|
|
|
 |
 |
 |
 |
May 31, 2005 – Backfill in Courtyard |
May 31, 2005 – Drywall at Atrium Ceiling |
May 31, 2005 - Southeast Elevation |
May 31, 2005 - Northeast Elevation |
| April 2005 |
|
|
|
 |
 |
 |
 |
| May 4, 2005 - Atrium Skylight Soffits |
May 4, 2005 - Atrium Scaffolding |
May 4, 2005 - Southeast Elevation |
May 4, 2005 - Northeast Elevation |
| March 2005 |
|
|
|
 |
 |
 |
 |
Fire Pump |
Drywall at Third Floor Offices |
Southeast Elevation |
Northeast Elevation |
| February 2005 |
 |
 |
 |
 |
Skylight and Penthouse Metal Panel Installation |
120 Seat Classroom Ductwork |
Northeast Elevation |
South Elevation |
| January 2005 |
 |
 |
 |
 |
Penthouse Air Handling Unit |
Electrical Substation |
Northeast Elevation |
South Elevation
|
| December 2004 |
 |
 |
 |
 |
West Side of Atrium |
West Elevation |
Northeast Elevation |
South Elevation |
| November 2004 |
 |
 |
 |
 |
Shaft No. 1 Ductwork |
West Elevation |
Northeast Elevation |
South Elevation |
| October 2004 |
 |
 |
 |
 |
| Third Floor Corridor Wall |
West Elevation |
North Elevation Precast |
South Elevation Precast |
| September 2004 |
 |
 |
 |
 |
South Elevation of the Building |
Concrete Slab on Deck Installation on the North Half Underway |
Roof Parapet Construction |
Precast Fins at the North Elevation |
| August 2004 |
 |
 |
 |
 |
| Architectural Concrete Wall at Ramp |
First Floor Corridor Facing the Dow Building |
Third Floor Slab Branch Power Rough-ins |
Structural Steel at Atrium from the South |
| July 2004 |
 |
 |
 |
 |
North Structural Steel from Southwest |
North Structural Steel from Northwest |
Foundations for Structural Steel on the South Half of the Building |
Structural Steel Erection Underway on South Half of the Building |
| June 2004 |
 |
 |
 |
 |
| Excavations at North Wall of First Floor June 2004 |
North Concrete Wall of First Floor June 2004 |
Initial Structural Steel Erection June 2004 |
Third and Fourth Floor Structural Steel North of E-Line June 2004
|
| May 2004 |
 |
 |
 |
 |
Elevator No. 1 Foundation |
Formwork at Stair #2 at the Dow Building |
Second Floor Concrete Foundaitons and Walls |
Concrete Wall at Dow Mechanical Room |
| April 2004 |
 |
 |
 |
 |
Reinforicng Steel Installation |
Completed Foundation Wall |
Foundation for Stair No. 1 |
Backfilling Foundations at the North Side |
| March 2004 |
|
|
|
 |
 |
 |
|
| Incoming Primary Power Ductbank Installation |
Stepped Footing Installation |
Excavation for Concrete Mass Footing |
|
| February 2004 |
|
|
|
 |
 |
 |
|
| Storm Sewer Piping and Structures at the North Side of the Site is Underway |
Crane Mobilized for Foundation Work |
Brick Mock Up Panels for Two (2) Brick Selections Under Consideration |
|
| January 2004 |
|
|
|
 |
 |
 |
|
| College of Engineering Project Control Center |
Dow Building Basement Exposed |
Rough Grade at Dow Building |
|