| April 2004 |
 |
South Elevation – Ribbon Building. April 2004 |
 |
Southwest view of East Tower. April 2004 |
 |
Northwest view of Ribbon Building and East Tower. April 2004 |
| March 2004 |
 |
View of the Ribbon Building (West). March 2004 |
 |
Northeast elevation. March 2004 |
 |
Northwest elevation. March 2004 |
| February 2004 |
 |
West Tower
February 2004 |
 |
West view of West Tower
February 2004 |
 |
East Tower February 2004 |
| January 2004 |
 |
Southwest Corner – Looking Northeast. January 2004 |
 |
January 2004 |
 |
North Elevation – Looking Southwest. January 2004 |
| November 2003 |
 |
East Tower looking Northeast. 600 x 800, 191k |
 |
Elevators H & I. 800 x 600, 74K |
 |
Level “C” Masonry & MEP Rough In. 800 x 600, 112K |
 |
West Tower @ corner of Huron and Glen. 800 x 600, 148K |
|
|
|
|
| June 2003 |
 |
View of West Tower east face.
640 x 480, 177K |
 |
View of Level B chiller area, Level B, Level 1 deck,
and West
Tower in background.
640 x 480, 181K
|
 |
Level 1 deck construction continues.
640 x 480, 175K |
| May 2003 |
 |
View of BSRB construction site from Couzens Hall.
640 x 480, 60K |
 |
View of West Tower Looking South
640 x 480, 64K |
 |
View of West Tower
Looking South.
640 x 480, 60K |
| No Photos for April |
| March 2003 |
 |
Level D slab-on-grade construction.
640 x 480, 59K |
 |
Construction of Level B and level 1 decks
continue.
640 x 480, 62K |
 |
West Tower level C mezzanine steel being
erected.
640 x 480, 63K |
| February 2003 |
 |
Vivarium Level B Deck looking south.
640 x 480, 50K |
 |
Level B looking north.
640 x 480, 55K |
 |
First deck pour Level B – supported
deck .
640 x 480, 60K |
| January 2003 |
 |
Fine Grade – Vivarium area Level
D and shoring system for Level B deck (looking west).
640 x 480, 65K |
 |
Level 1 – B Deck forming continues.
View is overlooking MER area.
640 x 480, 56K |
 |
Work continues on Level C slab-on-grade
view looking east.
640 x 480, 53K |
| December 2002 |
 |
West Tower looking South at Level C, 1st slab-on-grade
pour. Elevator “L” installation.
640 x 480, 62K |
 |
First slab on grade our Level C West Tower.
640 x 480, 57K |
 |
Interior concrete column construction continues Level D.
640 x 480, 62K |
| |
| November 2002 |
 |
Backfilling Level ‘C’ spread footings.
640 x 480, 57K |
 |
View of site from Couzens Hall.
640 x 480, 57K |
 |
View of site from Catherine Street parking ramp looking
south.
.640 x 480, 62K |
| |
| October 2002 |
 |
Concrete pumping truck at retention wall site pours.
640 x 480, 66K |
 |
Wall forming system of the BSRB project.
640 x 480, 63K |
 |
Pumping concrete in retention walls.
640 x 480, 60K |
| |
| September 2002 |
 |
View of tower cranes on east and west side of tunnel.
640 x 480, 64K |
 |
North wall of MER area.
640 x 480, 62K |
 |
Access road to Vivarium area.
640 x 480, 52K |
| |
July 2002 Click
on an image for a larger view. |
 |
View of Neuroscience Building Demolition
640 x 480, 55K |
 |
Mass Excavation
640 x 480, 52K |
|
|
| |
|
|
|
|
|