Biomedical Science Research Building

PhotosClick on an image for a larger view.

April 2004

South Elevation – Ribbon Building. April 2004

Southwest view of East Tower. April 2004

Northwest view of Ribbon Building and East Tower. April 2004
March 2004
View of the Ribbon Building (West). March 2004 Northeast elevation. March 2004 Northwest elevation. March 2004
February 2004
West Tower
February 2004

West view of West Tower
February 2004

East Tower
February 2004
January 2004

Southwest Corner – Looking Northeast. January 2004

January 2004 North Elevation – Looking Southwest. January 2004
November 2003
East Tower looking Northeast. 600 x 800, 191k Elevators H & I. 800 x 600, 74K Level “C” Masonry & MEP Rough In. 800 x 600, 112K
West Tower @ corner of Huron and Glen. 800 x 600, 148K        
June 2003
View of West Tower east face.
640 x 480, 177K

View of Level B chiller area, Level B, Level 1 deck, and West
Tower in background.

640 x 480, 181K

Level 1 deck construction continues.
640 x 480, 175K
May 2003
View of BSRB construction site from Couzens Hall.
640 x 480, 60K
View of West Tower Looking South
640 x 480, 64K
View of West Tower
Looking South.

640 x 480, 60K
No Photos for April
March 2003

Level D slab-on-grade construction.
640 x 480, 59K

Construction of Level B and level 1 decks continue.
640 x 480, 62K

West Tower level C mezzanine steel being erected.
640 x 480, 63K

February 2003

Vivarium Level B Deck looking south.
640 x 480, 50K

Level B looking north.
640 x 480, 55K

First deck pour Level B – supported deck .
640 x 480, 60K

January 2003

Fine Grade – Vivarium area Level D and shoring system for Level B deck (looking west).
640 x 480, 65K

Level 1 – B Deck forming continues. View is overlooking MER area.
640 x 480, 56K

Work continues on Level C slab-on-grade view looking east.
640 x 480, 53K

December 2002

West Tower looking South at Level C, 1st slab-on-grade pour. Elevator “L” installation.
640 x 480, 62K

First slab on grade our Level C West Tower.
640 x 480, 57K
Interior concrete column construction continues Level D.
640 x 480, 62K
 
November 2002

Backfilling Level ‘C’ spread footings.
640 x 480, 57K

View of site from Couzens Hall.
640 x 480, 57K
View of site from Catherine Street parking ramp looking south.
.640 x 480, 62K
 
October 2002

Concrete pumping truck at retention wall site pours.
640 x 480, 66K

Wall forming system of the BSRB project.
640 x 480, 63K
Pumping concrete in retention walls.
640 x 480, 60K
 
September 2002
View of tower cranes on east and west side of tunnel.
640 x 480, 64K
North wall of MER area.
640 x 480, 62K
Access road to Vivarium area.
640 x 480, 52K
 
July 2002 Click on an image for a larger view.
View of Neuroscience Building Demolition
640 x 480, 55K
Mass Excavation
640 x 480, 52K
   
           

Aerial Site Photo - 2000

Click on the image to enlarge (653 x 428, 74k)