Biomedical Engineering Project - Ann and Robert H Lurie Biomedical Engineering Building Laboratory Addition and Renovation

Photos - click on the image for a larger view.

July 2006        

July 31, 2006 – Southeast Elevation

July 31, 2006 – ATL Lobby

July 31, 2006 – CAEN Lab 1310

July 31, 2006 – Classroom 1123

July 31, 2006 – Wet Lab 1220

       

July 31, 2006 – Dry Lab 1105

       
June 2006        

June 30, 2006 - Southeast Elevation

June 30, 2006 – Corridor 2C16

June 30, 2006 – Dry Lab 1105

June 30, 2006 – Kitchen in Room 2251

June 30, 2006 – Wet Lab 1210

       

June 30, 2006 – Corridor 1C12

       
May 2006        

May 31, 2006 - Southeast Elevation

May 31, 2006 – Corridor 2C16

May 31, 2006 – Cable Tray in Corridor 1C14

May 31, 2006 – Millwork in Room 2153

May 31, 2006 – Wet Lab 1210

       

May 31, 2006 – Dry Lab 1105

       
June 2005

June 30, 2005 – Southeast Elevation

June 30, 2005 – East Elevation

June 30, 2005 – Southwest Elevation

June 9, 2005 – Switchgear Room Looking North

June 9, 2005 – Boiler Room Looking East

May 2005

May 31, 2005 – Southeast Elevation

May 31, 2005 - Southwest Elevation

May 31, 2005 - First Floor Looking South

May 31, 2005 – Lobby Area from Second Floor

May 31, 2005 – Second Floor West Wall Looking South
April 2005

May 4, 2005 - East Elevation

May 4, 2005 - Southwest Elevation

May 4, 2005 - First Floor Looking North

May 4, 2005 – Second Floor Looking North

 

March 2005

East Elevation

South Elevation

Second Floor Looking North
Lobby Stairs
February 2005

East Elevation

South Elevation

Entrance with Canopy and Sunscreen

Second Floor Looking North

 
January 2005        
 
East Elevation

South Elevation

Forming Equipment Pads

Second Floor Looking South

 
December 2004         
 
East Elevation

South Elevation Looking North

South West Elevation

Metal Shingles on North Elevation

 
November 2004        
 

Metal Shingle Installation on the North Elevation

West Elevation

East Elevation

South Elevation Looking North

 
October 2004        
 

West Elevation with Masonry Installation

South Elevation with Masonry Installation

Steel Erection of Canopy

South Elevation at Lobby Area

 
September 2004        
 

Triangle Portion Looking North

West Elevation with Exterior Stud Wall Installation

East Elevation

East Elevation

 
August 2004        
 

Second Floor Elevated
Slab

Steel Erection of Triangular Portion of Building
Steel Deck at Penthouse Level
Second Floor Elevated Slab Reinforcement
 
July 2004        
 

Steel Erection with Partial Decking

Steel column line looking toward existing building

Structural Steel with Metal Deck

Steel Erection at South end of Building

 
June 2004        
 

Steel Erection at Interface with Existing Building June 2004

Steel at Existing Building from the South June 2004

Steel at Existing Building from the Southwest June 2004
Steel Lay Down June 2004
 
May 2004        
 

Foundation at Northeast Corner from ATL Roof

Foundation at Northeast Corner from ATL Roof

Foundation for West Wall
Foundation for East Wall
 
April 2004        
 

Foundations in Progress

Building Pad with Grade Beams

Foundations in Progress

Forming for Foundations

 
March 2004        
 
Sanitary Piping in Progress

Building Pad is Complete

Connection to Storm Structure

Site Construction Fence Relocated

 
February 2004        
   

Building Pad in Process

Construction Fence in Place
Site Clearing Underway
   
         
         
         
         
         
         
         